深圳標(biāo)識設(shè)計正規(guī)的成果要求。
設(shè)計服務(wù)分為三個階段,包括概念設(shè)計、深化設(shè)計和設(shè)計與其他專業(yè)配合階段。各階段滿足下列內(nèi)容外,還要滿足國家規(guī)范、符合行業(yè)設(shè)計深度標(biāo)準(zhǔn),嚴(yán)格按照設(shè)計合同或招標(biāo)文件中規(guī)定的時間保質(zhì)保量地提供相應(yīng)成果,投標(biāo)人需根據(jù)國家有關(guān)設(shè)計承攬要求承擔(dān)設(shè)計責(zé)任。
1、設(shè)計成果提交形式:A3文本6份;電子版設(shè)計文件(PPT電子文件、CAD電子文件、AI電子文件 )
2、過程中,配合招標(biāo)人組織、參與針對成果的各階段,各類評審、論證的會議,配合各專項技術(shù)對接、各專業(yè)配合提資及合圖。
1、 配合招標(biāo)人組織并參與后期成果的培訓(xùn)、專利申請等。
時間要求:
工作內(nèi)容 | 起始時間 | 結(jié)束時間 | 備注 |
方案初步設(shè)計 |
|
| 成果要求見設(shè)計任務(wù)書 |
方案初步設(shè)計匯報及調(diào)整 |
|
| 匯報文件需提前3個工作日發(fā)至招標(biāo)人對接人處 |
深化設(shè)計 |
|
| 成果要求見設(shè)計任務(wù)書 |
招標(biāo)、施工服務(wù)階段 | 以項目進(jìn)度為準(zhǔn) | 成果要求見設(shè)計任務(wù)書 |
注:以上時間為暫定時間,具體時間可隨項目進(jìn)度調(diào)整;各個階段的詳細(xì)計劃,由雙方另行商議。
Shenzhen logo design formal results requirements.
The design service is divided into three stages, including conceptual design, deepening design and design and other professional cooperation stages. In addition to meeting the following content at each stage, it must also meet national specifications and meet industry design depth standards, and provide corresponding results in strict accordance with the time specified in the design contract or bidding document, and the bidder shall bear the design responsibility according to the relevant national design contract requirements .
1. Design results submission form: 6 copies of A3 text; electronic design documents (PPT electronic files, CAD electronic files, AI electronic files)
2. In the process, cooperate with the tenderer to organize and participate in various stages of results, various review and demonstration meetings, and cooperate with each special technology docking, and each professional to cooperate with the capital raising and drawing together.
1. Cooperate with the tenderer to organize and participate in the training and patent application of the later results.
time requirement:
Work content
Start time
End Time
Remarks
Preliminary design
See the design task book for the result requirements
Project preliminary design report and adjustment
The report documents need to be sent to the tenderer's docking office 3 working days in advance
Deepen the design
See the design task book for the result requirements
Bidding, construction service stage
Subject to project progress
See the design task book for the result requirements
Note: The above time is a tentative time, the specific time can be adjusted with the progress of the project; the detailed plan of each stage will be discussed separately by both parties.
人和時代設(shè)計
品牌設(shè)計、VI設(shè)計、標(biāo)識設(shè)計公司
什么是logo設(shè)計-深圳什么是logo標(biāo)識設(shè)計2024/03/05
帶通濾波器設(shè)計-深圳帶通濾波器標(biāo)識設(shè)計2024/03/05
黑龍江省林業(yè)設(shè)計研究院-深圳黑龍江省林業(yè)標(biāo)識設(shè)計研究院2024/03/05
停車位設(shè)計規(guī)范-深圳停車位標(biāo)識設(shè)計規(guī)范2024/03/05
手冊設(shè)計-深圳手冊標(biāo)識設(shè)計2024/03/05
長沙網(wǎng)站設(shè)計-深圳長沙網(wǎng)站標(biāo)識設(shè)計2024/03/05
玄關(guān)設(shè)計500-深圳玄關(guān)標(biāo)識設(shè)計5002024/03/05
公墓設(shè)計-深圳公墓標(biāo)識設(shè)計2024/03/05
110kv變電站設(shè)計-深圳110kv變電站標(biāo)識設(shè)計2024/03/05